Go to the Home page
About PTBA Bridge construction by Bellfree Contractors, Inc., click to visit
Site Map — Find the off-the-beaten-path info
About the Professional Trailbuilders Association
Contact information
Info on individual trail contractors Find contractors for your particular project Our annual conference for trailbuilders Find, buy, and sell trailbuilding equipment, tools, and supplies Trail information resources
Bellfree Contractors, Inc.
505 West Cypress
Redlands, California 92373
(W/H) 909-793-4501
or 800-706-2887
Fax 909-793-6921
rog@naturtec.com
www.naturtec.com
 
Bellfree Contractors, Inc. &
Naturtec: Trail and Bridge Technologies
Glulam bridge at golf course Crushed stone equestrian trail Long fiberglass bridge
Glulam bridge and lake
Anaheim Hills Golf Course, CA

Equestrian trail
City of Orange, CA
3 connected fiberglass trail bridges totaling 150', Olympic National Park, WA

Please see our website for both Bellfree and Naturtec at
www.naturtec.com


Roger Bell
President and Owner...

Bellfree Contractors, Inc., a trail and bridge construction firm, and Naturtec: Trail and Bridge Technologies, trail consulting and product representation for lightweight fiberglass bridges, soil stabilization products, trail signs, etc.

Background and current involvements...

  • Formerly a college administrator with a PhD in Higher Education from the University of Washington.
  • Past President and Board Member, Professional Trailbuilders Association.
  • Board Member and Treasurer, American Trails.
  • Board President, Whole Access (accessibility advocate organization).
  • Past Board Memeber and Secretary, San Timoteo Greenway Conservancy.
  • Board Member, Tri County Conservation League.
  • Advisor, Redlands Trail Committee.
  • Presenter to numerous trail and recreation conferences; several articles on trail advocacy issues, accessibility, etc.
  • Work with architects, planners, and administrators on trail developments of all kinds.

Consulting with regard to...

  • Trail design and layout--remote, urban, coastal, etc.;
  • Bridges and viewing areas for trails, parks, etc.;
  • Contract development for trails;
  • Locating qualified contractors, planners, architects, and advocates for projects;
  • Contract management and inspection;
  • Trail system planning and maintenance coordination;
  • Products and design solutions for erosion control, creek crossings,wetlands, low impact construction, soil stabilization, accessibility, resource protection.

Paved bike trail and block wall Trail cut on steep cross slope Geoweb retaining wall faced with concrete rounds
560' block wall, paved trail, fence.
El Capitan/Refugio State Beaches, CA
Santa Ana River Trail,
San Bernadino National Forest, CA
Geoweb wall and trails
Ocean Trails Golf Course,
Palos Verdes, CA

Site Map for the WTBA website — see everything at a glance
Trail Contractors | Project Solutions | Trailbuilders Conference | Equipment & Materials | Resource Links

Site Map | About PTBA | Contact Us | Privacy Policy

Copyright © 1999-2006 Professional Trailbuilders Association, Inc. All rights reserved.