Go to the Home page
About PTBA Bridge by Roe Construction, click to visit
Site Map — Find the off-the-beaten-path info
About the Professional Trailbuilders Association
Contact information
Info on individual trail contractors Find contractors for your particular project Our annual conference for trailbuilders Find, buy, and sell trailbuilding equipment, tools, and supplies Trail information resources
PO Box 8277
Truckee, CA 96162
W 530-587-9176
Fax 530-550-9303

About Roe Construction Log Trail Bridges Timber Trail Bridges Steel Trail Bridges 1 Steel Trail Bridges 2 Highway Bridges 1 Highway Bridges 2

McKenzie River Trail Bridges
USDA Forest Service, Willamette National Forest, Oregon

Construction of two native log bridges of 110' and 60'.
110' log bridge, left end 110' log bridge, middle 110' log bridge, right end
Lava Creek Bridge, 110' span. Source tree was approximately 250' high.

Steps and abutment of log bridge Heavy equipment moving log
Log steps and cribbing at the lower end. Preparing for the final placement of the log.

Planing the tread into the log Steps and abutment of 77' log bridge
Cutting the tread on the peeled log. Lost Creek Bridge, 60' span.

Skidding long log, left side Skidding long log, center Skidding long log, right
Log was skidded 3/4 mile.
About Roe Construction Log Trail Bridges Timber Trail Bridges Steel Trail Bridges 1 Steel Trail Bridges 2 Highway Bridges 1 Highway Bridges 2

Previous page Next page
Site Map for the WTBA website — see everything at a glance
Trail Contractors | Project Solutions | Trailbuilders Conference | Equipment & Materials | Resource Links

Site Map | About PTBA | Contact Us | Privacy Policy

Copyright © 1999-2006 Professional Trailbuilders Association, Inc. All rights reserved.