
Trail Projects for Bid
Photo: Timberline TrailCraft
Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to the trail industry.
Trail Construction Services: Howard County, MD
Howard County, Maryland seeks one or more qualified professional, trail construction firms to furnish on-call trail construction services for existing and new trail projects on County-owned park and open space lands.
Northen Minnesota MTB Trail
The project is a 15-17 mile wilderness purpose-built singletrack mountain bike trail.
Tutka Backdoor Access and Continuity, Homer AK
DEADLINE FOR RESPONSE IS FRIDAY, OCTOBER 13!
Catawba River Trail, NC
Approximately 3900 ft of 4ft wide natural surface trail along the Catawba River in Fort Mill, SC. The trail construction will include 3 boardwalks totaling 300 ft and two bridges totaling 100 ft. There will be a section that may require crushed concrete or gravel.
Columns Trail Extension Alignment/Installation, Eugene, OR
Align and install an approximately .07 mile long, 30” wide gravel surface trail with a section of timber steps and galvanized post and cable rails to the west summit of Skinner Butte.
Trail Master Plan – Clear Creek Open Space at Floyd Hill
The goal is to complete a singletrack trail system managed as non-motorized, mixed-use trails serving mountain bikers, hikers and runners.
Sand Canyon Trail Phase V
Construction of a new multi-use trail, including grading, compaction, guy wire relocation, curb cuts and installation of lodge pole fencing in the city of Santa Clarita, CA
Cleveland Barrens Natural Area Preserve Trail System, VA - Trail Construction
Trail project in Cleveland, VA in Virginia/Southwest Virginia
Trail Assessment of the J.R. Alford Greenway, Tallahassee, Florida, Re-Bid
Project to to conduct a trail assessment “to determine best use and layout of existing and potential new trails”
City of Eugene Blanton Ridge Trail Repair
Trail and timber retaining Wall Repair including the construction of a new portion of treated timber wall and backfill and replacement of trail base and cap
Bull Run/Occoquan Trail Assessment (Fountainhead Regional Park to Bull Run Marina) Fairfax County Virginia
6.5 mile Trail Assessment and Report
Pocahontas State Park
The trail work described in this scope of work is for 3 corridors of moderate level single track rolling contour trail.
Yonah Preserve Trail Construction – Phase 2
3.3 miles of beginner difficulty, singletrack trail construction
John Day Bike Park
Construct a mountain bike skills area and a joining mountain bike trail on 11 acres adjacent to the current 7th Street Park complex in John Day, Oregon.
Schoolyard Multi-use TrailSystem Project
Design-build contract for an estimated six- to eight-mile-network of singletrack trails on a section of land adjacent to Laramie, WY