Trail Projects for Bid

Photo: Timberline TrailCraft

Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to the trail industry.

Professional Trailbuilders Professional Trailbuilders

Coquina Trail Boardwalk, SC

Construction of ~280' boardwalk on the Coquina Trail sector spanning Shank's Creek in Poinsett State Park as replacement for the original CCC structure that was built during park construction in 1934

Read More
Professional Trailbuilders Professional Trailbuilders

Sheridan Community Land Trust

Construction of 31,755 +/- linear feet of non-motorized, single and multi-use, 24” – 36” natural surface trail as part of the Red Grade Trails System.

Read More
Professional Trailbuilders Professional Trailbuilders

Rattlesnake Trail, UT

Project is to construct a non-motorized backcountry/singletrack recreational trail to be an alternate route to the Rattlesnake Gulch Trail in Millcreek Canyon, Salt Lake County, Utah.

Read More
Professional Trailbuilders Professional Trailbuilders

Parleys Pointe-Bonneville Shoreline Trail Extension

Construction of a non-motorized backcountry/singletrack recreational trail for shared use in the foothills along the east bench of the Salt Lake Valley. Project includes approximately 3.5-4 miles of new Bonneville Shoreline Trail (BST) and an additional half mile of neighborhood connector trails.

Read More
Professional Trailbuilders Professional Trailbuilders

Trail Planning in WV

Project to develop a four property Fayette County based detailed trail plan that can be used to initiate a funding and grant strategy.

Read More
Professional Trailbuilders Professional Trailbuilders

Design Build-Atwood Park Silent Sports-Phase 2

1) A minimum 2-3 miles of multi-use single track in the East Expert Zone
2) The multi-use beginner loop south of the river
3) Development of multi-use return trails between the East Expert Zone, quarry, and Trailhead Zone
4) Development of downhill flow trails within the Trailhead Zone

Read More
Professional Trailbuilders Professional Trailbuilders

Pole Mountain Trail Construction (WY)

±10,200’ of new, natural surface, non-motorized trail on the Pole Mountain Unit of the Medicine Bow National Forest east of Laramie, Wyoming.

Read More