Trail Projects for Bid
Photo: Timberline TrailCraft
Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to the trail industry.
Hidden Valley Mountain Bike Trail Construction, MN
Approximately 9 miles of singletrack mountain bike trail construction
Coquina Trail Boardwalk, SC
Construction of ~280' boardwalk on the Coquina Trail sector spanning Shank's Creek in Poinsett State Park as replacement for the original CCC structure that was built during park construction in 1934
Camp trail to Josephine Mine, Bodfish, CA
Maintain / rebuild a trail (1/4 mile) from a campsite overlooking Lake Isabella to the Josephine Mine site.
Sheridan Community Land Trust
Construction of 31,755 +/- linear feet of non-motorized, single and multi-use, 24” – 36” natural surface trail as part of the Red Grade Trails System.
Butterfield Canyon Trail System - Utah
Trails Utah is looking for a group or individual with expertise in developing a multi-phased trail system plan and design.
Rattlesnake Trail, UT
Project is to construct a non-motorized backcountry/singletrack recreational trail to be an alternate route to the Rattlesnake Gulch Trail in Millcreek Canyon, Salt Lake County, Utah.
Parleys Pointe-Bonneville Shoreline Trail Extension
Construction of a non-motorized backcountry/singletrack recreational trail for shared use in the foothills along the east bench of the Salt Lake Valley. Project includes approximately 3.5-4 miles of new Bonneville Shoreline Trail (BST) and an additional half mile of neighborhood connector trails.
Metolius-Windigo Parallel Trail near Bend, OR
Design Build project is a 2.5-mile equestrian and hiking trail in the Deschutes National Forest near Mt. Bachelor.
Trail Planning in WV
Project to develop a four property Fayette County based detailed trail plan that can be used to initiate a funding and grant strategy.
Design Build-Atwood Park Silent Sports-Phase 2
1) A minimum 2-3 miles of multi-use single track in the East Expert Zone
2) The multi-use beginner loop south of the river
3) Development of multi-use return trails between the East Expert Zone, quarry, and Trailhead Zone
4) Development of downhill flow trails within the Trailhead Zone
Rocky Branch Park Improvements - North Carolina
The Green Zone and Blue Zone Trails are the second and third phases of a multi-phased plan outlined in the Rocky Branch Trail Enhancement Plan.
Design & Construction of Mountain Bike Trail - Grapevine Lake, Madisonville, KY.
Design & Construction of Mountain Bike Trail
RFP to develop Guidelines for watercraft launch facilities
Erie Canalway National Heritage Corridor
Preliminary Design - Patapsco Regional Greenway Sykesville to McKeldin
Preliminary design of two segments of the Patapsco Regional Greenway
ROCKY BRANCH PARK IMPROVEMENTS – CAROLINA THREAD TRAIL BELMONT EXTENSION
Construction of Phase 1 - 0.65 miles of multi-use trail
Pole Mountain Trail Construction (WY)
±10,200’ of new, natural surface, non-motorized trail on the Pole Mountain Unit of the Medicine Bow National Forest east of Laramie, Wyoming.
Switchback Construction and ~1000' of Trail construction (OH)
Approximately 1000 feet of new natural surface trail that includes approximately 4 switchbacks will need to be designed constructed by the vendor.