Trail Projects for Bid

Photo: Timberline TrailCraft

Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to the trail industry.

Professional Trailbuilders Professional Trailbuilders

Kingsbury Stinger OHV Trail - Realignment - Stateline, NV

Build approximately 1.5 miles of new multi-use (ATV/moto/bike/hike/equestrian) trail to realign the bottom of the Kingsbury Stinger OHV Trail. Approximately 0.25 miles of this trail will have table top jumps, rollers and berms incorporated.

Read More
Professional Trailbuilders Professional Trailbuilders

Superior Hiking Trail - Poplar River Reroute

~ 0.75 miles reroute near the Poplar River in Lutsen. The new route has been professionally laid out and flagged. Most of the work will involve tread construction, but there is an estimated 320 feet (in six separate locations) of wooden structure construction necessary to cross small drainages and streams.

Read More
Professional Trailbuilders Professional Trailbuilders

Yawgoo Pond Trail Boardwalk - RI

To retain our singular public access to this popular 2 mi. hiking trail, our project would necessarily re-route approximately 850' of trail into a wetland shrub-swamp. Best practices must be utilized per SKLT and RI DEM to protect sensitive wetland plants and soils. Approximately 700' of the trail will have to be an elevated boardwalk due to the swamp conditions.

Read More
Professional Trailbuilders Professional Trailbuilders

Trail Design + Management Plan at Ft Ticonderoga - NY

The proposed project will create a plan for construction upgrades and maintenance to Fort Ticonderoga’s current 1.7 mile battlefield trail as well as mapping and construction plans for new trail sections.

Read More
Professional Trailbuilders Professional Trailbuilders

Trail Construction on PA DCNR state forest lands (Rothrock State Forest)

The Friends of Rothrock and Pennsylvania Parks and Forest Foundation (PPFF) are seeking proposals from professional trail contractors to construct approximately 7.3 miles of natural surface trail in Musser Gap on PA DCNR state forest lands (Rothrock State Forest).

Read More
Professional Trailbuilders Professional Trailbuilders

Northeast Greenway Initiative and Scajaquada Creek Trail Extension - Buffalo, NY

GObike Buffalo is seeking a consultant (or team of consultants) with expertise in multimodal transportation, trails and greenways planning, traffic and civil engineering, landscape architecture and urban design to prepare a community-driven plan for the Northeast Greenway Initiative and Scajaquada Creek Trail Extension.

Read More
Professional Trailbuilders Professional Trailbuilders

Construction of Stinger Mountain Biking Trail - Redmond OR

Seeking bid proposals from qualified Design- Build Trail Contractors (Contractor) to provide professional services to complete construction of 1.2 miles of a non-motorized mountain bike trail west of Redmond, Oregon

Read More
Professional Trailbuilders Professional Trailbuilders

Easy CLiMB Connector Trail - OR

The Port is expanding its primary trailhead, brushing the existing trails, and building a connector trail to enhance on-site circulation for mountain bikers.

Read More
Professional Trailbuilders Professional Trailbuilders

Bountiful City Trails - UT

The purpose of the Request for Proposal (RFP) is to provide trail corridor alignments for all future trails identified in the 2019 Bountiful Trails Master Plan and within the Bountiful area consisting of a minimum of 20 miles.

Read More
Professional Trailbuilders Professional Trailbuilders

Southwoods Singletrack - Phase 1 - IA

The extent of work on this project is construction of up to approximately 1.6 miles of new, natural surface singletrack trails at Southwoods Park, West Des Moines, IA.

Read More
Professional Trailbuilders Professional Trailbuilders

Multi-Use Connector Trail in La Crosse WI

The project area encompasses moderate-to-rugged terrain with well-drained side slopes of 15-70% and some low-slope areas of less than 10%. Elevation ranges from 700 to 1,200 feet with some nearby vertical surfaces. The trail is a half mile in length and passes through mostly urban forest land, hardwoods, and a considerable amount of invasive plant species.

Read More