Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to the trail industry.

Professional Trailbuilders Professional Trailbuilders

COTA - Sisters Bike Park 242 - OR

COTA is seeking bid proposals from qualified Design-Build Trail Contractor to provide professional services to re-construct portions of Bike Park 242.

Read More
Professional Trailbuilders Professional Trailbuilders

COTA - Phils Skills Area - OR

This RFP is for the re-construction of the Phils Trailhead skills area and pump track in the DNF near Bend, Oregon. The skills area and pump track have deteriorated and are not fulfilling the needs of riders. The goal is to rebuild the skills area and pump track. There are three sections: (1) the pump track; (2) skills area that currently has a large section of rolls - this will have skinnies, rock gardens, and rock/wood up-and-overs when rebuilt; and (3) a progressive jump zone.

Read More
Professional Trailbuilders Professional Trailbuilders

COTA - Royal Flush Boulder Placement - OR


This RFP is for the transport and placement of approximately 120 boulders in the Deschutes National Forest to define appropriate parking areas and to prevent parking in undesirable locations. The work site is between Sunriver and Bend, Oregon. This project is connected to a larger effort to connect the Royal Flush trail to the Afternoon Delight trail.

Read More
Professional Trailbuilders Professional Trailbuilders

COTA - Wanoga Infield Skills Area - OR

This RFP is for the re-construction of the Wanoga in-field pump track in the DNF near Bend, Oregon. The pump track has deteriorated and is hard to maintain. The goal is to rebuild the pump track as a skills area with 3 to 4 distinct lines: Progressive jump lines and Drop zone with progressive sized drops. An easy return climbing route will also be included.

Read More
Professional Trailbuilders Professional Trailbuilders

EAST Trail Master Plan - Elkins, WV

The City of Elkins seeks an experienced natural service trail planning and design team to master plan bike optimized trail systems on three properties (236 acres total) and design and flag up to 10 miles of bike optimized trails as a shovel-ready demonstration project.

Read More
Professional Trailbuilders Professional Trailbuilders

West of Cascade Reroute - Superior Hiking Trail - MN

This reroute is about ⅔ miles long, with the goal of moving the trail upstream and away

from a failed bridge to a location that is less severe that will require a much smaller

structure to cross.

Read More
Professional Trailbuilders Professional Trailbuilders

Superior Hiking Trail - Silver Creek Reroute - MN

The new route is approximately 1400 feet long. Of the 1400 feet length, it is anticipated
that the majority of it will be full bench construction, but there will be approximately 170
feet of puncheon in five different locations, and another section that is flat and will need
puncheon or raised tread that is approximately 120 feet in length.

Read More
Professional Trailbuilders Professional Trailbuilders

Herbert and Gloria Jones Woodlands Trail System - WV

The project’s scope of work includes the construction of new shared use natural surface trail within City of Charleston Louden Heights Neighborhood of approximately +/- 65 acres of wooded land. The combined total of proposed trail is approximately 18,200 LF (3.40 mi).

Read More
Professional Trailbuilders Professional Trailbuilders

WEST HILL MOUNTAIN BIKE-OPTIMIZED SHARED-USE TRAIL SYSTEM PHASE ONE TRAIL CONSTRUCTION

The scope of work included in this RFP is for construction of two Project Components totaling 3.5 miles (phase one) of a 13-mile master trail plan created by IMBA Trail Solutions. Trail alignments for the 3.5 miles of trail have been flagged in the field and are described in the West Hill Master Trail Plan. Vendors may submit a bid for construction of one, or both, of the Project Components.

Read More
Professional Trailbuilders Professional Trailbuilders

CORA Little Miami Natural Surface Trail Corridor Design RFQ - OH

Project Description: Cincinnati Off-Road Alliance, an International Mountain Bicycling Association Chapter organization, seeks qualified trail design teams interested in providing design services for approximately 17 miles of Natural Surface Trails braided along the Little Miami Scenic River and Ohio to Erie Rail-Trail in Hamilton County, Ohio.

This RFQ intends to select a design team by qualifications to provide the initial design services for this project. The budget for the design phase is $25,000

Read More
Professional Trailbuilders Professional Trailbuilders

Wildcat Mountain Trail Project (Huron Manistee National Forest) - MI

The project includes approximately 15 miles of new trail construction, 11 miles of repurposing a decommissioned equestrian trail for mountain bike use and restoration of both decommissioned equestrian and user created trails in the project area.

Read More