Trail Projects for Bid

Photo: Timberline TrailCraft

Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to the trail industry.

Professional Trailbuilders Professional Trailbuilders

Rick's Canyon Connector Trail - Logan, UT

CTA is requesting proposals from qualified individuals or firms to provide trail design services for the Rick’s Canyon connector trail, which will be planned and designed as one trail with multiple entry and exit points. The project build will be implemented in phases. The ultimate scope of work for this project is to create a plan which will stake out a route that connects across the top (east side) of Ricks, to Steel Hollow, over to Trail Hollow connecting to Ephraim’s Cutoff, and finally an easy way (current trail is rated a black trail) down option to Willow Creek—in total approximately 13 miles of realigned and even entirely new trail.

Read More
Professional Trailbuilders Professional Trailbuilders

Emerald Mountain Directional Downhill Bike Trail Design - Steamboat Springs, CO

 The City of Steamboat Springs is soliciting proposals from qualified contractors to provide professional services for the design and construction of one (1) advanced mountain bike downhill directional trail on Emerald Mountain in Steamboat Springs, Colorado. The trail will be a new trail for advanced riders connecting the top of Emerald Mountain with the base of the Howelsen Hill Ski Area.

Read More
Professional Trailbuilders Professional Trailbuilders

Town of Charlotte VT - Portion of Village Loop Trail, South of Ferry Road

The Town of Charlotte is requesting bid proposals from trail construction contractors to build a portion of an existing, unimproved town trail called the “Village Loop Trail” located within easements south of Ferry Road, approximately 1,250 feet in length. Approximately 378 feet of the trail is to consist of puncheon which is to be constructed and installed by the contractor. Construction will also involve the installation of culverts at specified locations, the laying of crushed stone, and the removal of primarily invasive woody vegetation.

Read More
Professional Trailbuilders Professional Trailbuilders

Nature Trail Renovation and Construction Phase 1 - Lamberton NJ

This project proposes to construct one new bridge, repair all eroded portions of the existing trail, and construct new trails totaling 4,923 linear feet to expand the existing trail system. Refer to Figure 1 below for details.

Read More
Professional Trailbuilders Professional Trailbuilders

Pre-solicitation: Southern Region Trails Blanket Purchase Agreement - US Forest Service.

The intent of this BPA is to provide coverage within 5 categories of activities related to recreational trails within the Southern Region of the Forest Service which includes National Forest System lands in Alabama, Arkansas, Oklahoma, Florida, Georgia, Kentucky, Louisiana, Mississippi, North Carolina, Puerto Rico, South Carolina, Tennessee, Texas, and Virginia.

Read More
Professional Trailbuilders Professional Trailbuilders

Central Arizona Project (CAP) Trailhead & Trail Fencing Improvement Project

The base bid for the improvements consists of the provision of all labor, materials and equipment needed for the new and/or modified fencing and gate improvement and the new South Florence Trailhead area at SR 79 and Salazar St.  The following three additive alternates may be added to the work at the County’s discretion.
1. Add-alternate 1 – Picacho Trailhead
2. Add-alternate 2 – Cactus Forest Trailhead
3. Add-alternate 3 – Trail Improvements and Signage

Read More
Professional Trailbuilders Professional Trailbuilders

Flathead National Forest - GAOA Trail Clearing - MT

The work involves performing Specification Clearing on select non-wilderness trails on Hungry Horse-Glacier View Ranger District that have not been maintained in some time. The type of work includes “Logging Out” all downed or leaning trees within the clearing limits, removing sticks, and re-cutting previously cut logs that do not meet clearing specification and standards. Trail clearing standards, specifications and performance requirements are detailed in the attachments to this notice.

Read More
Professional Trailbuilders Professional Trailbuilders

Lowes Creek Skills Park and Playground - WI

Seeking proposals for plans and conceptual designs for two skills areas: a bicycle playground and skills park for strider to green riders, and a ~3.5 acre skills park targeted to more-experienced riders.

Read More
Professional Trailbuilders Professional Trailbuilders

New Velomont Trail Segment - Braintree, VT

This section of trail is to be built as a mountain bike-optimized multi-use trail that is approximately 1 mile long depending on final trail alignment. All new trail design and construction must follow International Mountain Bike Association (IMBA) sustainable trail building standards.

Read More
Professional Trailbuilders Professional Trailbuilders

Huck Finn Park - Leadville, CO

Redesign and construction of a sustainable jump and skills park surrounding the asphalt pumptrack to meet applicable industry and safety standards which, once built, requires less maintenance over time with more manageable surfaces, beginner through advanced jump lines, the addition of durable lips, and skills section.

Read More
Professional Trailbuilders Professional Trailbuilders

Doris Wigington Park Mountain Bike Trails - GA

The City of Jasper, Georgia (herein referred to as “Client”) is seeking a professional trail builder to provide an experienced trail crew to perform specified mountain bike trail design-build construction on shared-use (bike/hiking/trail running) trails in Doris Wigington Park

Read More
Professional Trailbuilders Professional Trailbuilders

Construction and Rehabilitation of Highway Vehicle Trails - TX

This project includes up to 24 miles of trails including construction of 14.4 miles of new trails and 9.62 miles of rehabilitated trails. The entirety of the trails on this project will be designed for off-highway vehicle traffic. A preliminary site assessment was conducted in January of 2023. All existing trails were geolocated and new trail alignments were proposed. This project includes the final Layout and construction of the proposed new trails along with the rehabilitation of the existing trails as described. Trail signage is also included in this project.

Read More
Professional Trailbuilders Professional Trailbuilders

 Peninsula State Park (WI) Mountain Bike Trail Design RFP

Peninsula State Park is requesting proposals from qualified Mountain Bike Trail Designers capable of providing site condition assessments, complete conceptual design and cost estimates, design development documents and cost estimates, and construction documents for the new mountain biking network.

Read More
Professional Trailbuilders Professional Trailbuilders

MOSHASSUCK RIVER PRESERVE ACCESSIBLE TRAIL DESIGN - RI

planning and design of a long-lasting, evenly surfaced trail at its Moshassuck River Preserve in Lincoln, RI. The trail will be designed to allow persons with limited mobility, who might otherwise be precluded from hiking trails due to uneven surfaces and dramatic slopes, easier access to the preserve so they may participate in an immersive experience to enjoy the preserve’s natural features.

Read More
Professional Trailbuilders Professional Trailbuilders

Chestnut Ridge Park Eternal Flame Trail Safty Enhancement - NY

Reconstruction of segments of the Eternal Flame Trail in Chestnut Ridge Park to incude steping enhancements on the desending trail, readjusting trail pathway along the stream bed and clearing stream bed of fallen timbers the purpose of which is to significantally improve the saftey of the trail hike.

Read More
Professional Trailbuilders Professional Trailbuilders

 Butter Gap Area Trails Project -Pisgah Ranger District, Pisgah National Forest - NC

 Full details of project and RFP will be distributed at Pre-Bid Meeting. Summary below w/ approximate distances:

4.87 Miles New Trail Construction
1.30 Miles Existing Trail Decommissioning 
1.50 Miles Existing Trail maintenance 
Several sections heavy rock armoring 
Heavy Timber Bridges; (2) 30 foot, (2) 20 foot, (2) 16 foot.

Read More