
Trail Projects for Bid
Photo: Timberline TrailCraft
Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to the trail industry.
MTB Trail Construction in Ohio
This project for the addition of roughly 9 miles of trails, will create a stacked loop system and allow riders access from multiple trailheads. The new trails will allow for a more well-rounded cross country mountain bike trail system.
Development of a trail plan for a trail in Naples, NY
The Naples Trail Collective invites experienced trail planning consultants to submit proposals for the development of a Trail Plan for Naples, NY. The Trail Plan will be the shared vision and roadmap to develop and maintain an exceptional, diverse, and sustainable shared-use network of trails in the Naples, NY region of the Finger Lakes.
Construction of a 2001-foot universal access trail in Maine
Three Rivers Land Trust is seeking the services of a qualified professional firm to construct a 2,001-foot universal access trail at Sanford Community Forest in Sanford, ME, according to prepared engineering specifications. Trail trail passes through a young forest to a meadow where programming is planned. The average grade is just under one percent and the maximum grade is 5.75%. A thirty-foot puncheon is planned.
Construction of 7 mile shared use trail in WV
The City of Oak Hill in partnership with the New River Gorge Regional Development Authority is seeking qualified natural soft surface trail builders to construct 7 miles of shared-use and bike only singletrack at Needleseye Park in Oak Hill, WV. It is preferred that this work be completed by November of 2024.
CAMBA MTB Trail Reroute and Rehab in WI
CAMBA seeks a contract builder experienced in traditional, hand-built bench cut singletrack trails. Machine building with micro-excavator is an option.
Construction of 1 mile MTB trail in IA
Construction of up to approximately 1 mile of new, natural surface singletrack trails at Southwoods Park (350 S. 35th St, West Des Moines, IA 50265). Base bid will consist of construction of approximately 1-mile singletrack trail loop suitable for intermediate users (blue route) and associated trail features. Project also includes three (3) bid alternates for alternative trail features. All work to include materials, labor and equipment necessary to complete project no later than November 1, 2024.
Shared Use & MTB Trail Construction in New Yor
Construction of shared-use mountain bike-optimized and mountain bike specific trails at the Hickory Ridge/West Hill Preserve in Naples, NY. The scope of work is for construction of approximately 3.6 miles (phase two) of a 13-mile master trail plan created by IMBA Trail Solutions.
Construction of Multi Use Trail in California
The Project will construct approximately 1.5-miles of the Ojo de Agua Trail, an approximately 6-foot-wide natural surface trail, which will support public use of the Coyote Canyon park property. The scope includes tree pruning, protection, removals, grading and earthwork, installation of aggregate base rock, rock crossings, armoring, erosion control BMPs, and fencing removal and installation.
Shared Use Natural Surface Trail Construction in West Virginia
This project is for construction of 5 miles of shared-use natural surface trail at Cacapon State Park in WV. The WV DNR seeks qualified firms with experience in constructing high quality shared-use and mountain bike trails that provide excellent mountain bicycling opportunities. This is the first phase of a fully funded 35 mile trail construction project.
Design and Construction of MTB Trails in Oklahoma
The Project consists of design and construction of approximately 2.51 miles of advanced and downhill mountain bike optimized, shared-use trails.
Bike Park Build Phase 2 in Utah
While Phase 2 will be adding a pavilion, tables, restrooms, water and a playground, the focus of this Request for Proposal (RFP) pertains exclusively to the construction of the bike park area. This section will encompass flow trails, session zones, a skills loop, jump lines, and various features designed to facilitate bicycle skill development for riders ranging from beginners to experts.
Trail Design and Construction in Missouri
Design and construction of up to eight (8) miles of surface trail development at the Gans Creek Recreation Area in Columbia, Missouri.
Rehabilitate the Laurel Falls Trail at Great Smoky Mountains National Park in TN
This project will rehabilitate the Laurel Falls trail in Great Smoky Mountains National Park.
Bike Park Construction in Iowa
The Project consists of design and construction of approximately 2.51 miles of advanced and downhill mountain bike optimized, shared-use trails in Iowa.
Trail Design & Engineering in North Carolina
The County of Burke, Friends of Fonta Flora, and Overmountain Victory North Carolina State Trail Friends Group are seeking the professional services of a qualified professional firm or team of firms to provide design services and construction documents for three separate sections of the co-located Fonta Flora State Trail (FFST) and Overmountain Victory State Trail (OVST) in the western part of Burke county.
Bridge Replacement in TN
Replacement of the existing pedestrian bridge and the associated trail segments
Universally Accessible Trail Design and Construction in ME
Constructing approximately 4,800 linear feet of new Universally Accesible (UA) trail on the powerline corridor between West Elm Street and Hillside Street in Yarmouth, ME.
Hiking Trail Rebuild in MN
The Superior Hiking Trail Association is seeking proposals to renew a one-mile section of a popular loop hiking trail on the Cascade River, 10 miles west of Grand Marais, MN. The work involved will include structure construction (puncheon, boardwalk, timber steps), tread rehab, and 5 short reroutes from 50 feet to 600 feet in length, totaling just under 1000 feet. The trail is much loved, and the maintenance is much deferred. We hope to complete all of the work during the 2024/25 construction season.
MTB Trail Design and Build in ID
The purpose of this request for proposals is to solicit bids from contractors interested in designing and building approximately three miles of new mountain bike-optimized, two-directional trail on Schweitzer Mountain Properties (SMP) -owned property between the roundabout on Schweitzer Mountain Road (4,250 feet) and Spires Spur (5,250 feet) in Sandpoint, Idaho.